Kaneohe Bay Drive
click on thumbnail [+]
 
       
       

 

Problem: 6-ft. max height retaining wall to be built on edge of a 20-ft. grade difference between properties, and on expansive soil (clay).

Solution: Micropiles incorporated into reinforced Grade Beam and Tie-back Anchors incorporated into reinforced Integraspec wall. Wall was finished with Sto and back-filled to create driveway for client.

 

 

<<back to Photo Gallery Index